November 11: Singapore’s November Build-To-Order flat application window closes today at 11:59pm Singapore time, according to the Housing & Development Board’s sales-launch page. The exercise offers 7,964 flats across seven projects, with selection by computer ballot rather than arrival order.
Key highlights
- The application period runs from November 4 to November 11.
- A valid HDB Flat Eligibility letter is required when applying.
- The seven projects include Standard, Plus and Prime flats.
- Applicants should compare eligibility, ownership conditions and budget alongside location.
What is on offer
HDB’s November 4 launch release identifies projects in Bedok, Geylang, Sembawang, Tengah, Toa Payoh and Yishun. Sembawang Anchor has 1,310 shorter-waiting-time flats, with waits below three years. HDB says the other six projects have waits below four years.
The exercise is the first since monthly household income ceilings rose to S$16,000 for families and S$8,000 for singles. Those ceilings do not replace other eligibility requirements or establish that every household below them qualifies for every flat type.
The projects at a glance
| Classification | Projects |
|---|---|
| Standard | Sembawang Anchor; Plantation Dew; Chencharu Acres |
| Plus | Bayshore Sails; Bayshore Oasis; Merpati Meadow |
| Prime | Toa Payoh Hillside |
Why the classification matters
HDB says Plus and Prime flats receive additional subsidies and carry more stringent conditions, including a 10-year minimum occupation period and subsidy recovery on resale. A lower initial price therefore needs to be assessed alongside the conditions applying later.
For a household comparing options, affordability is more than the advertised starting price. The relevant calculation uses the household’s actual grant and financing eligibility, available resources and likely commitments. An illustrative after-grant price should not be treated as a quotation for every applicant.
What to check before the deadline
HDB requires a valid HFE letter at application. Its launch release says the HFE application service is temporarily unavailable during November 4–11 and resumes on November 12. An applicant should not assume that starting a new HFE process today guarantees entry into the exercise closing tonight.
The ballot system also changes how readers should interpret the deadline. Applying earlier within the window does not confer a first-come-first-served advantage. The important point is completing an eligible application before the window closes and checking the official portal for the applicable options.
The next opportunity
HDB’s release previews about 4,300 BTO flats and about 5,000 Sale of Balance Flats in February 2027. These are the announced approximate figures. Readers planning for that exercise should check the authority’s subsequent details and its advice to prepare HFE documentation early.
The deadline in this article is Singapore local time. The official sales portal should be the final reference for application status; this report does not submit an application or determine eligibility.
File photo: HDB flats in Toa Payoh, September 2006. Terence Ong / Wikimedia Commons, CC BY 2.5. Cropped and resized. Not a photograph or rendering of the November 2026 projects.





